marktadesonAug 16, 20131 min readWinona Road Bridge and the Peach FestivalThe bridge on Winona Road is undergoing construction, but it will be open for pedestrian traffic on the weekend of the Peach Festival (August 23 – 25). The bridge is scheduled to be fully reopened on September 20th, 2013.
The bridge on Winona Road is undergoing construction, but it will be open for pedestrian traffic on the weekend of the Peach Festival (August 23 – 25). The bridge is scheduled to be fully reopened on September 20th, 2013.
Comments