
The City of Hamilton is conducting important fieldwork along Glancaster Road (Dickenson Road West to Garner Road/Rymal Road West) as part of the Municipal Class Environmental Assessment for roadway improvements.
To properly evaluate potential roadway cross-sections and alignments, a detailed tree inventory is required along the corridor. Additionally, a Species at Risk survey will be conducted within the west-side (Ancaster) woodlot, further from the existing roadway edge.
🔗 View the study map here: City of Hamilton Environmental Assessments
Field Work Details:
📅 Start Date: March 24, 2025 (subject to snowmelt)
⏰ Timeframe: 1 – 1.5 weeks (between 8 a.m. – 4 p.m. daily)
🌳 Conducted by: AECOM tree arborist team
👥 Additional Monitoring: Indigenous Nations’ representatives and/or Niagara Peninsula Conservation Authority staff may be present.
📌 Scope:
The inventory will primarily take place from the public right-of-way
Five (5) landowners have been contacted via mail with Permission to Enter (PTE) forms for tree inventory within private woodlot areas
Field staff will use tape measures and binoculars – no structures or buildings will be entered
Your cooperation and awareness are greatly appreciated as the City works to ensure a thorough environmental assessment for the future of Glancaster Road.
For questions or concerns, please contact:
📞 905-546-2110
Comments