Upcoming Construction Notice: This Summer the city of Hamilton has scheduled the removal of Bridge #355 on White Church Road East of Miles Road. The work includes the removal of the bridge, lowering the elevation of the road and raising the elevation of the trail to create an at-grade intersection. Construction begins on July 30 and weather permitting will be completed in October.
During construction White Church Road will be closed between Ferris Road and Tyneside Road and Miles Road will be closed between Chippewa Road to Airport Road. The Rail trail will also be closed between Airport Road and Miles Road connections. Local and emergency Access will be maintained throughout construction.
Commentaires