from (Harrison Rd. to Fletcher Rd.) – October 19 to November 20, 2020
Rehabilitation and roadside safety improvement works for a concrete box culvert on Kirk Road near Binbrook Conservation Area will require that Kirk Rd. be CLOSED to through traffic between Harrison Rd. and Fletcher Rd. from Mon. October 19th (at 8 a.m.) until or before Fri. November 20th. The culvert construction site is 0.55 km westerly of Harrison Rd. (west of the access to 4165 Kirk Rd.).
Comments