UPGRADES for the Glanbrook Arena
- Crista Cooper
- Apr 25, 2014
- 1 min read
Over the summer you will see the following upgrades:
Given problems with well water a new well will be drilled and the old well will be capped.
There will be a new heating and air unit placed on the roof.
The front area will be getting assessable doors installed.
There will be a new Concession area and counters.
A water filling station will be installed in the lobby for personal water bottle use.
A handicap washroom will be installed.
The men’s and woman’s washrooms will both see new fixtures and upgrades.
There will be new paint in the front entranceway and lobby area.
Comments