In order to facilitate the installation of sanitary & storm sewer pipes, a pair of man-hole structures and a natural gas line under the current Regional Road 56 reconstruction project (C-15-05-15),  the WEST leg only of Binbrook Road at the Reg. Rd. 56 intersection will be CLOSED to traffic commencing on Monday May 9th at 9 a.m. until or before May 31st.   Access is fully available to/from both entrances of the commercial plaza located in the southwest quadrant of the Binbrook Rd. / Reg. Rd. 56 intersection.

 

A designated Detour Route will be posted for deviated Binbrook Road (west) through traffic to utilize Fall Fair Way to/from Regional Rd. 56 (aka ‘Hwy. 56’).

Read More